Adult Detention Project List |
Ada County Jail, 300 Bed Expansion and 500 Bed Renovation - Boise, Idaho
This 800 bed facility included custom touch screen graphic computer
systems for duress, audio monitoring, door control and monitoring,
intercom and paging systems, and CCTV system camera selection at the
indirect management central control rooms. The six node touch screen
system also included control of domestic water, power, lighting, and
television circuits. All systems were fully integrated through the use
of a PLC system. Other systems included television distribution,
UPS, and fire alarm systems.
Ada County Jail, 150 Bed Medical Unit Addition - Boise, Idaho This
150 bed facility included custom touch screen graphic computer systems
for duress, audio monitoring, door control and monitoring, intercom and
paging systems, and CCTV system camera selection at the indirect
management central control rooms. The new three node touch screen
system expanded the jails’ existing six node touch screen system designed
by HK in 2001. Also included were controls of domestic water, power,
lighting, and television circuits. All systems were fully integrated
through the use of a PLC system. Other systems included UPS, television
distribution, and fire alarm systems.
Ada County Jail, POD D Expansion - Boise, Idaho
Work in this 1000+Bed Adult Male and Female Jail included a 60-bid expansion, a
new touch screen networked into the existing system and a new PLC system node
networked into the existing system. The existing intercom, surveillance television,
CATV, and duress alarm systems were also expanded to support the new Pod.
Anaconda County Juvenile Detention Facility - Anaconda, Montana
This new 70-bed facility included custom touch screen graphic computer systems for
duress, audio monitoring, door control and monitoring, intercom and paging systems,
and CCTV system camera selection at the indirect management central control room.
The touch screen system also included control of power, lighting, television, and
detainee telephone circuits. LCD touch screen panels were designed for each of the
direct management officers’ stations. All systems were fully integrated through
the use of a PLC system. Other systems included television distribution visitors’
intercom and access control (card reader) systems
Berkeley Public Safety Building (city jail) - Berkeley, California This
70-Bed detention facility included intake, dormitory, single cell, and
multiple departmental administration spaces. Systems included custom
control panels for integration of door monitoring and control, local
intercom, and CCTV system. All Systems were fully integrated through
the use of a PLC system. General security was provided in the
administration and property holding areas utilizing glass breakage
detection, motion detection, and door position monitoring. Other
systems included CATV, visitors' intercom, line-up intercom systems,
and covert audio and video monitoring and archiving.
Clackamas County Jail Security Renovation and Upgrade - Oregon City, Oregon
This 320 bed existing facility included a new 10 bed medical wing and 25 bed
dorm and new Central Control and Security Electronics room. The work included
the total renovation of the security and communications systems and the hot
cutover to a new 9 node touch screen graphic computer system for audio
monitoring, door control and monitoring, intercom and paging systems, and CCTV
system camera selection at a distributed network of indirect management
stations. The touch screen system also included control of power, lighting,
inmate telephones and HVAC circuits. All systems were fully integrated through
the use of a new distributed PLC system with redundant headend processors and
power supplies. All CCTV and audio systems are automatically recorded at high
resolution for an extended period of time. The audio and video systems utilized
new and existing analog systems which is encoded for networking to facilitate
off-site recording and monitoring. All video was routed through a matrix
switcher to eliminate latency and the resultant loss of lip-sync associated with
most IP video systems. Also included was a 48 seat video visitation system and
visitor’s intercom systems.
Coalinga State Mental Hospital for Violent Offenders. - Coalinga, California This
1500 bed, $365,000,000 - 1,000,000 sq. ft. facility includes touch
screen graphic computer systems for duress alarm and audio monitoring,
door control and monitoring, intercom and paging systems, a two layer
perimeter security system, and CCTV system with digital video
archiving. LCD touch screen panels are provided at direct management
officers' stations, and custom designed control panels are provided at
the towers and at selected other CDC stations. All DMH systems were
fully integrated through the use of a PLC system. CDC systems were
integrated through the use of hard-wired relay logic systems. Other
systems included master PBX type intercom, television distribution,
visitors intercom,
key control systems, and access control (card reader) systems.
Columbia County Jail - St. Helens, Oregon This
300-bed facility includes custom control panels for duress alarm
monitoring, audio monitoring, door control and monitoring, intercom and
paging systems, and CCTV system camera selection at the indirect
management officers' stations. The control panels were also utilized
for control of domestic water, power receptacles, lighting circuits,
and the television system. All systems were fully integrated through
the use of a PLC system. Other systems included television
distribution, visitor's intercom,
UPS, and access control (card reader) systems.
Colorado 750 Bed Women’s Detention Facility – Co.
This new privately owned 800 bed (including 50 segregation intake and medical bed)
facility included an 10 node redundant touch screen graphic computer systems and a
hierarchy of control takeover for duress, audio monitoring, door control and
monitoring, intercom and paging systems, and CCTV system camera selection. Also
included were digital video recording of both video and audio associated with
events and duress alarms, a master PBX type intercom system, and visitor’s intercom
systems.
Columbia County Courthouse and Existing Jail Renovation - St. Helens, Oregon These
facilities were upgraded to modernize the entry officers' stations.
Work included the renovation, expansion, and relocation of the existing
CCTV, duress alarm monitoring, and door monitoring systems.
Columbia County Jail 224 Bed Expansion Project – St. Helens, Oregon.
This project consists of a multi-node touch screen graphical user interface connected through a distributed PLC system utilizing redundant processing for the monitoring and control of security systems throughout the facility. Controlled systems include CCTV, intercom and paging, and door and gate monitoring and control systems. Other systems included
CATV and video recording systems. Layered systems allow for control transfer to the existing Central Control Room.
Deschutes County, Master Plan – Bend, Oregon.
This master plan included a review of all CCTV and security systems in the existing jail and formed the basis for the work later defined in the existing jail renovation project, the renovation of the existing work release center, and the construction of the new jail facility.
Deschutes County Jail, Work Release Center – Bend, Oregon.
The work of renovation this existing 80-bed detention facility included a local indirect officer’s station and a remote officer’s station at the adjacent Jail Central Control Room. Systems included touch panels integrated with door control and monitoring, CCTV with digital video recording, and intercom & paging systems.
Deschutes County Jail Renovation – Bend, Oregon.
The work in this existing 228-bed detention facility included the replacement of all existing control panels with a custom designed, multi-node touch screen graphic computer systems for monitoring and control of doors, intercom and paging systems, and CCTV camera systems into a modern PLC based integrated detention electronics system. The four node touch screen system also included integrated with the nearby Work Release Center and facilitates remote takeover of that facility. Control of the Jail includes control of power, lighting, and television circuits as well as inmate telephone circuits.
Deschutes County New Jail and Courts Complex – Bend, Oregon.
The work in this new 350-bed detention facility included a 6 node custom developed touch screen graphical user interface (GUI) for monitoring and control of doors, intercom and paging systems, and CCTV systems into a single PLC based system interfaced with the adjacent Work Release Center and Existing Jail. Control of the new Jail also includes control of power, lighting, and television circuits and inmate telephone circuits.
Eastern Oregon Correction Institution - Pendleton, Oregon This
renovation of an existing 1800 bed adult detention facility included
the replacement of the existing fire alarm system and interface to
existing door control and elevator systems using a networked touch
screen control system.
Fremont City Public Safety Building - Fremont, California This
facility included dormitory, single cell, and multiple departmental
administration spaces. Systems included custom control panels for
integration of door monitoring and control, local intercom, and CCTV
system. All Systems were fully integrated through the use of a PLC
system. The control panels were also utilized for control of domestic
water, power receptacles, lighting circuits, and the television system.
General security was provided in the administration and property
holding areas utilizing glass breakage detection, motion detection, and
door position monitoring. Expansion of the adjacent facilities existing
access control (card reader) system was also included. Designs for
24-hour video archiving of all CCTV cameras were provided. Other
systems included
UPS, MATV, visitors' intercom, and line-up intercom systems.
Fresno County Main Jail and South Annex Renovations - Fresno, California Work
in these facilities included renovation of existing spaces and the
supporting control panels, the addition of new CCTV cameras, and an ADA
upgrade of the existing fire alarm and the existing security systems.
The systems include custom control panels for duress alarm monitoring,
audio monitoring, door control and monitoring, intercom and paging
systems, and CCTV system camera selection at the indirect management
officers' stations. All systems were fully integrated through expansion
of existing Simplex and Grinell fire alarm systems.
Fresno County North Jail 200 Bed Expansion (3 new Floors) - Fresno, California This
200-bed expansion of an existing 2-story jail included the construction
of 3 new floors each with a mezzanine level, above the existing
building. The systems include custom control panels for duress alarm
monitoring, audio monitoring, door control and monitoring, intercom and
paging systems, and CCTV system camera selection at each of the three
indirect management officers' stations and at the Central Control Room.
Revisions and replacements of existing control panels were also
included. All systems were fully integrated through expansion of an
existing Simplex fire alarm system. Other systems included fire alarm,
television distribution, and visitors intercom systems.
GSH Mental Health Treatment Facility - Corvallis, Oregon This
project consisted of the expansion of an existing hospital to provide 2
psychiatric wards. The project included the addition of two indirect
management officers' stations. Work included designs for custom touch
screen graphic computer systems including the provision and integration
of all security, door control and monitoring, intercom, paging and
duress systems. Work also included a new access control system, and
expansion of the existing CATV system.
Humboldt County Courthouse - Eureka, California The
renovation of this three story courthouse included the fire alarm and
security electronics renovation of the intake and holding areas and all
administration and court facilities. The systems include sound systems,
duress, audio monitoring, door control and monitoring, intercom and
paging systems, and CCTV, and television distribution systems.
Idaho State Mental Health Facility - Idaho
This new 340 bed medium/maximum security mental health facility includes
kitchen, laundry, and administration spaces. Systems included a custom
muti-node touch screen graphic computer systems for door monitoring and
controls, intercom and paging systems, duress alarm monitoring, and CCTV
system camera selection with digital video recording. Each of the systems
was fully integrated through the use of a PLC system. Auxiliary controls
of power, domestic water, dayroom and cell lighting, and HVAC fan controls
were also included. Other systems included a CATV distribution and access
control (card reader) systems.
Idaho State Women’s Prison Security and Life-Safety Renovation D/B - Pocatello, Idaho
This 200 bed facility included a custom, multi-node touch screen graphic
computer systems to support the replacement and expansion of the door
control and monitoring, intercom and paging systems, duress alarm
annunciation, and CCTV system camera selection at the indirect management
central control rooms. Other systems included the total replacement
of the fire alarm system.
Island County Jail Facility - Whidbey Island, Washington
Upon Completion of the Island Count Jail Fire Alarm
Replacement and the new Island County Juvenile Facility Project, HK was awarded
the Island County Jail Security Electronics Replacement Project.
In this 40 bed facility, work included the total replacement
of the facilities existing PLC system, hardwired replay logic systems, control
panel system, and touch screen system (less than 2 years old) with a new touch
screen and PLC system for door and intercom monitoring and control. To minimize
costs while increasing the system Mean-Time-Between-Failure statistics, HK's designs
utilize the new pair of redundant PLC used in the adjacent facility for all
system processing. To reduce spares inventories and simplify the counties maintenance
of the two systems, the designs require the same equipment by used in the Jail
as in the Juvenile facility.
King County Jail Maleng Regional Jail Security Renovation - Seattle, Washington
Work in this 1400+Bed Adult Male and Female Jail included the total replacement
of the existing 23-node touch screen system and the 25-node PLC system used for
door, intercom, surveillance television, duress, perimeter security, elevators,
and various utilities. Renovation and/or expansion of the personal duress, perimeter
security, intercom, and CCTV systems were also included, as well as the total
replacement of the UPS power system.
King County Jail Maleng Regional Justice Center Security Renovation/Replacement - Seattle, Washington
Work in this 233,0000 sq. ft., 5 story court house included a 26,000 sq. ft. renovation of existing spaces to
create 5 new courtrooms. Each new courtroom was provided with associated judges’ chambers, and support spaces.
Systems included courtroom A/V with Video Arraignment. Security elements included access control (card reader
system), door, intercom, surveillance television, and duress system monitoring and control.
Kitsap County Jail, 200 Bed Expansion and 150 Bed Renov. - Port Orchard, Washington This
350 bed facility included custom touch screen graphic computer systems
for duress, audio monitoring, door control and monitoring, intercom and
paging systems, and CCTV system camera selection at the indirect
management central control rooms. The touch screen system also included
control of domestic water, sprinkler water, power, lighting, elevators,
and television circuits. LCD touch screen panels are provided at each
of the existing and new direct management officers' stations. All
systems were fully integrated through the use of a PLC system. Other
systems included television distribution, visitor's intercom,
UPS, and access control (card reader) systems.
Lane County Public Safety Building and Court House - Eugene, Oregon The
renovation of this five story courthouse included the security
electronics renovation of the intake and holding areas and all
administration and court facilities. The systems include duress and a
comprehensive access control system replacing 7 existing non-interfaced
systems of differing manufacturers and means of gaining access to
areas, into a single site wide system.
Legal Offenders' Unit (300 bed), Western States Hosp. - Lakeview, Washington This
300 bed, $60,000,000 - 168,000 square foot facility includes custom
control panels for duress alarm monitoring, audio monitoring, door
control and monitoring, intercom and paging systems, and CCTV system
camera selection at the indirect and direct management officers'
stations. All systems were fully integrated through the use of a PLC
system. Central Control Room consoles used for mounting the control
panels, CCTV monitors, and other equipment was also designed by HK.
Other systems included fire alarm, television distribution, visitor's
intercom,
UPS, and access control (card reader) systems.
Lewis County Jail, 200 Bed Expansion and 150 Bed Renov. - Chehalis, Washington This
350 bed facility included custom touch screen graphic computer systems
for audio monitoring, door control and monitoring, intercom and paging
systems, and CCTV system camera selection at the indirect management
central control rooms. The touch screen system also included control of
domestic water, sprinkler water, power, lighting, elevators, and
television circuits. Also included was a video visitation system with
expansion capabilities of video arraignment. All systems were fully
integrated through the use of a PLC system. Other systems included
television distribution, visitor's intercom,
UPS, and access control (card reader) systems.
Marysville City Jail Security Electronics Renovation - Marysville,
Washington. This
detention electronics systems upgrade included the renovation of
existing security electronics utilizing a new PLC system equipped with
touch panels. The project also included the renovation and expansion of
the existing CCTV system.
Marine Corps Air Station (MCAS) Brig at Miramar D/B - San
Diego, California.
This $28M expansion project included the renovation of existing security
electronics utilizing a PLC system networked with an 8 node touch screen system
for remote control and monitoring of doors, intercoms, and CCTV system. Existing
systems were expanded and included the ability of the existing Central Control
Room to take control of each of the remote officers stations individually.
Multnomah East County Corrections, Oregon State Courts, and Gresham City Jail - Gresham, Oregon
This project included courts and holding areas along with administration areas for city, county, and state offices. Systems included a PLC based multi-node touch screen (GUI) system to monitor and control doors, intercoms, duress, and CCTV systems. The CCTV system included a DVR system for recording of both audio and video media. Also included were courtroom sound systems, video visitation, video arraignment, and
Multnomah County Detention Center Booking Renovation - Portland, Oregon
This project consisted of a renovation of the facilities booking
center. Work includes new custom control panels and an integrated door
control, CCTV, intercom and paging, and security system. Other systems
include CATV distribution. The County directed that the systems are "to
be designed as closely to that which HK provided for the Inverness Jail
Project as possible." Booking detainees during the renovation process
was performed at the Temporary Booking Facility also designed by HK.
Multnomah County Inverness Jail (Phase 2 & 3) Expansion - Portland, Oregon Phase
2 expansion of this 220-bed facility to 440 beds included the complete
renovation of all administration areas. Phase 3 expansion of the
facility to 920+ beds is currently in the final stages of completion.
Work included designs for custom control panels for the replacement of
all security, door control and monitoring, intercom, paging and video
surveillance systems. Other systems included two access control
systems, nurse call,
radio, UPS, and MATV distribution.
Multnomah County Inverness Jail, Mental Health Conversion - Portland, Oregon This
project consisted of the conversion of 2 segregation units (54 bed)
from maximum security to a psychiatric facility for legal offenders.
The project included the addition of direct management officers
stations and the renovation of the Central Control Room. Work included
designs for custom control panels to support the direct management
officers' stations including the integration of all security, door
control and monitoring, intercom, paging, and duress systems. Other
work included the addition of master intercom stations, telephone and
data outlets, and the relocation of power and television outlets.
Multnomah County Mead Bldg A & D Treatment Facility - Portland, Oregon This
facility is a high rise, alcohol and drug treatment facility. General
security was provided throughout the facility utilizing glass breakage
detection, motion detection, and door position monitoring. Provision of
an access control (card reader) system was also included at
departmental entries and in elevator cabs. CCTV system designs and
24-hour video archiving was included.
Multnomah County Temporary Booking Facility - Portland, Oregon This
project consisted of modular facility to be utilized during the
renovation process of the MCDC Booking facility. Work included new
custom control panels and an integrated door control, CCTV, intercom
and paging, and security system. Other systems include CATV distribution. The County directed HK "to design the systems as closely
to those designed for Inverness Jail by HK as possible." Due to the
8-month life expectancy of the facility, a key design feature was to
provide systems that had either high salvagability for use as spares in
other facilities, or where systems could not be salvaged, be
inexpensive.
Multnomah County River Patrol - Portland, Oregon This
police station includes custom control panels, integrated door control,
CCTV, intercom and paging, and security systems. Other systems include
access control system networked to the County wide card reader
system.
Multnomah County Wapato Jail - Portland, Oregon This
new 500+ bed (expandable to 2000 bed) facility includes custom control
panels and an integrated door control,
CCTV, UPS, intercom and paging, and security system. Other systems
include access control, nurse call, radio and CATV distribution. The
County directed HK that the systems are "to be designed as closely to
that which HK provided for the Inverness Jail Projects as possible."
The systems featured redundant PLC processors and power supplies in a
centralized network.
Oregon State Master Plan - Salem, Oregon
This master plan evaluated the existing condition, expansion capacity, spares
inventories, remaining economic life of every data and telecommunications system
and every security, fire and communications system in the Oregon DOC system.
Oregon State Penitentiary - Salem, Oregon This
renovation of an existing 2000 bed adult detention facility included
the replacement of the existing fire alarm system and interface to
existing door control and elevator systems using a networked touch
screen control system.
Oregon City Commissioners, A/V and Video Arraignment Renovation
- Oregon
Work included a comprehensive remotely controllable A/V
system for voice reinforcement, sound reinforcement, A/V projection. The system
was utilized for video arraignment, video evidence projection, recording of
audio and video onto numerous recording formats. In addition of video
arraignment, proceedings are back-fed to the cable television system franchisee
holder for state-wide distribution. Components include two R/W DVD's units, two
VCR's a document scanner, video projection, six computer VGA inputs, a VGA
switcher, a 32 channel audio mixing board, a courtroom assisted listening
system, pre-view and program monitors, remotely controllable P/T/Z cameras,
title generator, and split screen fader, CATV back-feed equipment.
Oregon Women's Correctional Center Perimeter Security (Report) - Salem, Oregon
This project included a report detailing the condition, salvagability, remaining economic life,
reparability, and replacement costs of the existing site perimeter security systems.
Oregon Women's Correctional Center, Central Control Room Renovation - Salem, Oregon
This project included the security electronics upgrade of the security systems in the control room.
Oregon State Penitentiary, Site Fire Alarm Replacement
- Salem, Oregon
This renovation of an existing 200 bed adult detention facility included the
replacement of the existing fire alarm system and interface to existing door
control and elevator and elevator systems using a networked touch screen control
system.
Due to the success of this project, Mr. Hopkins was given the
additional projects including OSP's Intensive Management Unit, OSP's Central
Control Room Renovation, OWCC Control Room Renovation, and OWCC Site CCTV system
replacement, and several other ODC projects.
Oregon State Penitentiary, Intensive Management Unit, CCTV Up-Grade - Salem, Oregon This
project included in new CCTV system and up-grades to the IMU control
rooms for the multi-pod intensive management unit of the prison.
Pierce County Jail - Washington
Designs for this 1776 bed detention facility includes the renovation of an
existing 776 beds and 1000 new. Systems include provision of custom control
panel / touch screen graphic computer systems for integration of door
monitoring, door control, intercom and paging, and CCTV systems. Other systems
include fire alarm, and telephone/data and television distribution systems.
San Diego County Women’s Prison - San Diego, California
Upon winning the design competition for this project work in this new 1440+Bed Adult
Female Jail campus (expandable to 2000-beds) design/build project included a 16-node
touch screen and PLC system with a digital intercom, personal duress, and perimeter security.
The surveillance television systems is a 250 camera analog system with DVR’s to support
high resolution camera recording 24/7 for 25 months. Remote control of dayroom power,
lights, exhaust fan, etc. was also provided.
Seattle Metropolitan 640-Bed Jail - Seattle, Washington
This new 640+ bed city jail includes a multi-node touch screen
system with a centralized PLC system for integrated control of
the cell and movement doors, intercom and paging, the CCTV, duress
alarm, and general security systems. External systems to be integrated
include cell and dorm lighting, TV power, domestic water, and
inmate telephone. The systems featured redundant PLC processors in
a centralized network. Other systems include access control
(card reader), video visitation, visitor’s intercom, video arraignment,
and CATV distribution systems.
Tehama County Jail, Security Electronics System Replacement - Red Bluff, California
Work included our construction administration services
for the total replacement of the facilities fire alarm and security
electronics systems including t he door monitoring and control systems, and the
CCTV and intercom/paging system headend elements
Tillamook County Law Enforcement & Correctional Center - Tillamook, Oregon.
This combination police station and 90 bed jail includes a networked
touch screen system that integrates security, door monitoring and
control, intercom,
CCTV, and MATV system control. The touch screen system was also
programmed to control lighting, power, domestic water and time-out
functions of the visitor’s intercom, and other supplementary systems.
Also included was a stand-alone access control system.
Thurston County Accountability and Restitution Center (Phase 1) - Olympia Washington
This new 350 bed medium/maximum security jail includes housing,
kitchen, laundry, and administration spaces. Systems included custom
touch screen graphic computer systems for door monitoring and controls,
intercom and paging systems, duress system monitoring, and CCTV system
camera selection with digital video recording, a video visitation system,
and video arraignment systems. Each of the systems was fully integrated
through the use of a PLC system. Auxiliary controls of power, domestic
water, dayroom and cell lighting, and HVAC fan controls were also included.
Other systems included a CATV distribution and access control (card reader)
system. Also, Courtroom A/V renovation was provided to support the new
County-wide video arraignment systems.
Thurston County Accountability and Restitution Center (Phase 2) - Olympia Washington
This new 310 bed medium/maximum security jail expansion includes housing,
Video Visitation Systems, and the Renovation of the existing Court facility
to facilitate Video Arraignment. Systems included custom touch screen graphic
computer systems for door monitoring and controls, intercom and paging systems,
duress system monitoring, and CCTV system camera selection with digital video
recording, a video visitation system, and video arraignment systems. Each of
the systems was fully integrated through the use of a PLC system. Auxiliary
controls of power, domestic water, dayroom and cell lighting, and HVAC fan
controls were also included. Other systems included a CATV distribution.
Tohono O'odham Combination Jail / Juvenile Detention Facility - O'odham, Arizona This
new combination jail/juvenile detention facility includes a graphic
touch screen computer system for integrated door control, CCTV,
intercom and paging, and security systems. Other systems include access
control, and CATV distribution. The systems featured redundant PLC
processors and power supplies in a centalized network.
Waianae Police Station (Adult and Juvenile
Holding)– Kapolei, Hawaii
This new $8M police station included segregated adult, juvenile, male, and
female holding, and processing areas. Systems included custom touch screen
graphic computer systems for door monitoring and controls, intercom and paging
systems, duress system monitoring, and CCTV system camera selection with digital
video recording. Each of the systems was fully integrated through the use of a
PLC system. Other systems included a CATV distribution and access control (card
reader) system.
Warm Springs Indian Reservation Security Electronics Evaluation Report – Warm Springs, Oregon
Work included a thorough evaluation of the reservations existing CCTV, intercom, door and gate monitoring systems as well as their existing control electronics and control panel systems.
Washington State Reformatory, Closed Custody Conversion - Monroe, Washington This
renovation of an existing 640-bed adult detention facility included a
new touch screen system to replace existing control panels. Work
included integration to an existing field equipment and CCTV video
switching systems and the addition of a new PLC system to replace their
existing hard wired control panel system. Design criteria included:
redundancy in PLC system control electronics, redundancy in touch
screen software and hardware, capability of taking control from housing
touch screens by central control, and automatic control switchover to
central control from housing in case of duress initiation.
Additionally, this system was to harden the facility and bring it from
medium security to closed custody. The system provides the ability of
the operator to select a cell in preparation of door control; when
selected, the nearest camera pans to the cell and zooms in on the
inmates cell front to allow the officer to observe the scene prior to
opening the door.
Due to the success of this project, the following projects were awarded to HK:
Washington State Reformatory, Rotunda 1 & 2 (Visitation) Renovation
Washington State Reformatory, I/K Renovation
Washington State Reformatory, Tower 9 Renovation
Washington State Reformatory, IMU Renovation
Washington State Reformatory, Segregation Renovation
Washington State Reformatory, Perimeter Security Fence Detection System
Washington State Reformatory, Site CCTV Surveillance Television System
Western State Hospital, Legal Offenders Unit - Washington
Construction of this new eight ward, 240,000 square foot facility have
recently begun. Systems include custom control panels with integrated
door monitoring and control, CCTV, intercom and paging system. Other
systems include fire alarm, access control, MATV, telephone and data
distribution systems.
|